Remarks |
|||||||
The vessel is currently under way. It has two screw pumps with a capacity of 230 cubic meters per hour and one centrifugal pump with a capacity of 100 cubic meters per hour. Three pairs of tanks are filled with heavy fuel oil and one pair of tanks with diesel. A special dry dock inspection was carried out in April 2025.
![]() |
|||||||